ITAC Assessment: HO0193
ITAC logo
ITAC Assessment: HO0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Composite Plastics
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 64,000
ft2
Annual Production 45
ton
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,863 1,047,773
kWh
Electricity Demand $37,730 3,439
kW-mo/yr
Electricity Fees $10,649 -
Natural Gas $50,157 9,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,159 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,287

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,758 $16,993 $3,692
43,962
kWh
$2,066
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $785 $1,000 $506
6,155
kWh
$279
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,524 $360 $1,524
16,706
kWh
- - - -
04 2.7496: Install partitions to reduce size of conditioned space $395 $400 - - $395
-
MMBtu
- -
05 2.7233: Use properly designed and sized hvac equipment $825 $2,000 - - $825
-
MMBtu
- -
06 4.611: Begin a practice of predictive / preventative maintenance $1,000 $300 - - - - $1,000
07 3.5212: Regrind, reuse, or sell scrap plastic parts $1,872 $3,500 - - - $1,872
-
lb
-
08 4.123: Reduce defects by reducing product tipping $2,000 $10,000 - - - - $2,000
09 4.123: Reduce defects by reducing product tipping $5,000 $3,000 - - - - $5,000
TOTAL RECOMMENDED $19,159 $37,553 $5,722
66,823
kWh
$2,345
-
kW-mo/yr
$1,220
-
MMBtu
$1,872
-
lb
$8,000
TOTAL IMPLEMENTED $10,287 $21,053 $5,722
66,823
kWh
$2,345
-
kW-mo/yr
$1,220
-
MMBtu
- $1,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs