ITAC Assessment: UU0014
ITAC logo
ITAC Assessment: UU0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Electrical-mechanical devices
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area 15,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $22,477 746,560
kWh
Electricity Demand $16,376 2,344
kW-mo/yr
Electricity Fees $2,691 -
Natural Gas $1,685 244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,374 $9,639 $2,958
113,300
kWh
$1,416
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,319 $60 $892
34,164
kWh
$427
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $620 $440 $419
16,060
kWh
$201
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $602 $1,195 $443
16,984
kWh
$159
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $192 $300 $130
6,570
kWh
$62
-
kW-mo/yr
TOTAL RECOMMENDED $7,107 $11,634 $4,842
187,078
kWh
$2,265
-
kW-mo/yr
TOTAL IMPLEMENTED $1,939 $500 $1,311
50,224
kWh
$628
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs