Assessment Year | 2011 |
---|---|
Principal Product | Transceiver |
NAICS | 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing |
SIC | 3663: Radio and Television Broadcasting and Communications Equipment |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
57,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 2,295
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,155 | 1,678,680 |
kWh
|
$0.057 |
Electricity Demand | $64,360 | 11,354 |
kW-mo/yr
|
$5.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,135 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $33,729 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $16,812 | $34,688 |
$11,020
122,442
kWh
|
$5,792
-
kW-mo/yr
|
|
02 | 2.7221: Lower temperature during the winter season and vice-versa | $11,265 | $2,500 |
$7,383
82,036
kWh
|
$3,882
-
kW-mo/yr
|
|
03 | 2.7496: Install partitions to reduce size of conditioned space | $8,406 | $12,400 |
$5,510
61,221
kWh
|
$2,896
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,489 | $5,225 |
$2,285
25,389
kWh
|
$1,204
-
kW-mo/yr
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,157 | $50 |
$918
10,196
kWh
|
$239
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,006 | $1,320 |
$804
8,927
kWh
|
$202
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $42,135 | $56,183 |
$27,920
310,211
kWh
|
$14,215
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $33,729 | $43,783 |
$22,410
248,990
kWh
|
$11,319
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs