ITAC Assessment: MI0203
ITAC logo
ITAC Assessment: MI0203
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Transceiver
NAICS 334220: Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
SIC 3663: Radio and Television Broadcasting and Communications Equipment
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 57,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,295
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,155 1,678,680
kWh
Electricity Demand $64,360 11,354
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,729

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7425: Clean or color roof to reduce solar load $16,812 $34,688 $11,020
122,442
kWh
$5,792
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $11,265 $2,500 $7,383
82,036
kWh
$3,882
-
kW-mo/yr
03 2.7496: Install partitions to reduce size of conditioned space $8,406 $12,400 $5,510
61,221
kWh
$2,896
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,489 $5,225 $2,285
25,389
kWh
$1,204
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,157 $50 $918
10,196
kWh
$239
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,006 $1,320 $804
8,927
kWh
$202
-
kW-mo/yr
TOTAL RECOMMENDED $42,135 $56,183 $27,920
310,211
kWh
$14,215
-
kW-mo/yr
TOTAL IMPLEMENTED $33,729 $43,783 $22,410
248,990
kWh
$11,319
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs