Assessment Year 2001
Principal Product Aluminum products
NAICS
n/a
SIC 3354: Aluminum Extruded Products
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 240,000
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $236,237 8,942,048
kWh
Electricity Demand $157,241 20,580
kW-mo/yr
Electricity Fees $49,543 -
Natural Gas $305,939 48,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,568 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,308 $9,973 $6,060
200,527
kWh
$4,248
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,643 $75 $1,916
63,403
kWh
$727
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $1,495 $680 $1,068
35,342
kWh
$427
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,361 $2,792 $1,859
61,521
kWh
$502
-
kW-mo/yr
05 2.4314: Use synthetic lubricant $761 $600 $544
18,002
kWh
$217
-
kW-mo/yr
TOTAL RECOMMENDED $17,568 $14,120 $11,447
378,795
kWh
$6,121
-
kW-mo/yr
TOTAL IMPLEMENTED $15,207 $11,328 $9,588
317,274
kWh
$5,619
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs