ITAC Assessment: UU0072
ITAC logo
ITAC Assessment: UU0072
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Jet engines
NAICS 333611: Turbine and Turbine Generator Set Units Manufacturing
SIC 3511: Steam, Gas, and Hydraulic Turbines, and Turbine Generator Set Units
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area
n/a
Annual Production 200
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $579,215 20,882,400
kWh
Electricity Demand $325,381 38,965
kW-mo/yr
Natural Gas $155,544 30,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $289,340 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $17,050 $21,660 - $17,050
-
kW-mo/yr
- - -
02 2.3191: Use demand controller or load shedder $10,670 $10,000 - $10,670
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $16,150 $17,500 - - $16,150
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $6,450 $8,500 - - $6,450
-
MMBtu
- -
05 2.7135: Install occupancy sensors $940 $600 $940
32,700
kWh
- - - -
06 2.8114: Change rate schedules or other changes in utility service $203,380 $800,000 - - - - $203,380
07 3.5112: Reprocess spent oils on site for re-use $34,700 $6,000 - - - $34,700
-
gal
-
TOTAL RECOMMENDED $289,340 $864,260 $940
32,700
kWh
$27,720
-
kW-mo/yr
$22,600
-
MMBtu
$34,700
-
gal
$203,380
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs