Assessment Year 2001
Principal Product Hydraulic flight control systems
NAICS
n/a
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 1,000
Plant Area 270,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $352,223 14,215,400
kWh
Electricity Demand $205,572 29,412
kW-mo/yr
Electricity Fees $(-9,637.0) -
Natural Gas $35,553 17,369
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,365

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $12,515 $19,380 - $12,515
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,476 $18,287 $6,449
226,220
kWh
$3,027
-
kW-mo/yr
-
03 2.2437: Recover waste heat from equipment $3,538 $1,000 $2,580
90,488
kWh
$958
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $560 $650 - - $560
-
MMBtu
05 2.4314: Use synthetic lubricant $1,276 $600 $930
32,631
kWh
$346
-
kW-mo/yr
-
TOTAL RECOMMENDED $27,365 $39,917 $9,959
349,339
kWh
$16,846
-
kW-mo/yr
$560
-
MMBtu
TOTAL IMPLEMENTED $27,365 $39,917 $9,959
349,339
kWh
$16,846
-
kW-mo/yr
$560
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs