ITAC Assessment: UU0006
ITAC logo
ITAC Assessment: UU0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Trailer Manufacturer
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area 15,000
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 4,590
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $16,626 584,493
kWh
Electricity Demand $38,144 5,160
kW-mo/yr
Electricity Fees $3,665 -
Natural Gas $28,923 6,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,674 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,525

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,732 $461 $708
23,489
kWh
$1,024
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,664 $215 $1,985
65,680
kWh
$1,679
-
kW-mo/yr
03 2.4221: Install compressor air intakes in coolest locations $483 $462 $261
8,635
kWh
$222
-
kW-mo/yr
04 2.4314: Use synthetic lubricant $378 $300 $198
6,571
kWh
$180
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $417 $388 $219
7,248
kWh
$198
-
kW-mo/yr
TOTAL RECOMMENDED $6,674 $1,826 $3,371
111,623
kWh
$3,303
-
kW-mo/yr
TOTAL IMPLEMENTED $4,525 $977 $2,444
80,886
kWh
$2,081
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs