| Assessment Year | 2001 |
|---|---|
| Principal Product | Machined metal products |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
15,000
ft2
|
| Annual Production | 2,500
pieces
|
| Production Hrs. Annual | 4,590
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $6,589 | 237,880 |
kWh
|
$0.028 |
| Electricity Demand | $7,422 | 913 |
kW-mo/yr
|
$8.13 |
| Electricity Fees | $542 | - |
|
- |
| Natural Gas | $6,228 | 838 |
MMBtu
|
$7.43 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $4,792 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,409 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $177 | $107 |
$112
3,701
kWh
|
$65
-
kW-mo/yr
|
- | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,462 | $300 |
$928
30,741
kWh
|
$534
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $265 | $837 |
$135
4,461
kWh
|
$130
-
kW-mo/yr
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,268 | $2,762 |
$477
15,784
kWh
|
$791
-
kW-mo/yr
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $161 | $156 | - | - |
$161
-
MMBtu
|
|
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $947 | - |
$357
11,818
kWh
|
$590
-
kW-mo/yr
|
- | |
| 07 | 2.4314: Use synthetic lubricant | $220 | $400 |
$85
2,808
kWh
|
$135
-
kW-mo/yr
|
- | |
| 08 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $292 | $1,060 | - | - |
$292
-
MMBtu
|
|
| TOTAL RECOMMENDED | $4,792 | $5,622 |
$2,094
69,313
kWh
|
$2,245
-
kW-mo/yr
|
$453
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,409 | $300 |
$1,285
42,559
kWh
|
$1,124
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs