ITAC Assessment: SF0060
ITAC logo
ITAC Assessment: SF0060
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Specialty Wire and Cable
NAICS
n/a
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range $50
M
to 100
M
# of Employees 165
Plant Area 88,000
ft2
Annual Production 1,200
ton
Production Hrs. Annual 8,112
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $508,281 5,611,665
kWh
Natural Gas $34,868 5,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,343 $2,320 $3,343
34,584
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,112 $750 $2,112
23,740
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,582 $18,315 $10,582
118,699
kWh
04 2.4239: Eliminate or reduce compressed air usage $876 $1,291 $876
9,965
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,429 $1,233 $1,429
16,120
kWh
06 2.4314: Use synthetic lubricant $1,512 $732 $1,512
16,999
kWh
TOTAL RECOMMENDED $19,854 $24,641 $19,854
220,107
kWh
TOTAL IMPLEMENTED $18,978 $23,350 $18,978
210,142
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs