ITAC Assessment: UM0487
ITAC logo
ITAC Assessment: UM0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Aquence Coating and VAA
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 460,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,640
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,060 4,652,000
kWh
Electricity Demand $111,090 10,640
kW-mo/yr
Natural Gas $265,266 55,451
MMBtu
TOTAL YEARLY COSTS $843,416
RECOMMENDED SAVINGS* $69,037 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $3,265 $4,500 $3,265
32,653
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $42,701 $105,530 $30,964
309,636
kWh
$6,878
-
kW-mo/yr
- $4,859
03 2.2514: Cover open tanks $23,071 $2,137 - - $23,071
-
MMBtu
-
TOTAL RECOMMENDED $69,037 $112,167 $34,229
342,289
kWh
$6,878
-
kW-mo/yr
$23,071
-
MMBtu
$4,859
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs