ITAC Assessment: UM0480
ITAC logo
ITAC Assessment: UM0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Steering Assembly Components
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 80,000
ft2
Annual Production 2,700,000
units
Production Hrs. Annual 2,600
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $899,450 11,017,800
kWh
Electricity Demand $234,144 39,024
kW-mo/yr
Electricity Fees $7,387 -
Natural Gas $24,998 7,462
MMBtu
TOTAL YEARLY COSTS $1,165,979
RECOMMENDED SAVINGS* $49,537 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $35,941 $20,000 $22,677
276,547
kWh
$5,877
-
kW-mo/yr
$7,387
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,908 $2,500 $1,908
23,266
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,601 $28,500 $6,601
80,495
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,087 $6,000 $5,087
62,042
kWh
- -
TOTAL RECOMMENDED $49,537 $57,000 $36,273
442,350
kWh
$5,877
-
kW-mo/yr
$7,387
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs