Assessment Year | 2017 |
---|---|
Principal Product | Steering Assembly Components |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
80,000
ft2
|
Annual Production | 2,700,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $899,450 | 11,017,800 |
kWh
|
$0.082 |
Electricity Demand | $234,144 | 39,024 |
kW-mo/yr
|
$6.00 |
Electricity Fees | $7,387 | - |
|
- |
Natural Gas | $24,998 | 7,462 |
MMBtu
|
$3.35 |
TOTAL YEARLY COSTS | $1,165,979 | |||
RECOMMENDED SAVINGS* | $49,537 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $35,941 | $20,000 |
$22,677
276,547
kWh
|
$5,877
-
kW-mo/yr
|
$7,387 | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,908 | $2,500 |
$1,908
23,266
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,601 | $28,500 |
$6,601
80,495
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,087 | $6,000 |
$5,087
62,042
kWh
|
- | - | |
TOTAL RECOMMENDED | $49,537 | $57,000 |
$36,273
442,350
kWh
|
$5,877
-
kW-mo/yr
|
$7,387 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs