Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Chassis Components
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $100
M
to 500
M
# of Employees 408
Plant Area 255,850
ft2
Annual Production 80,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,239,205 15,031,722
kWh
Natural Gas $86,182 68,836
MMBtu
TOTAL YEARLY COSTS $1,325,387
RECOMMENDED SAVINGS* $16,112 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,675 $3,500 $5,675
69,207
kWh
-
02 2.7135: Install occupancy sensors $8,944 $3,740 $8,944
109,081
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $780 $350 - $780
-
MMBtu
04 2.2414: Use waste heat from hot flue gases to preheat $713 $3,700 - $713
-
MMBtu
TOTAL RECOMMENDED $16,112 $11,290 $14,619
178,288
kWh
$1,493
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs