Assessment Year | 2016 |
---|---|
Principal Product | Hard chrome and electroless nickel plating |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 36 |
Plant Area |
37,140
ft2
|
Annual Production | 500,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,744 | 1,922,160 |
kWh
|
$0.092 |
Electricity Demand | $4,966 | 387 |
kW-mo/yr
|
$12.82 |
Natural Gas | $18,933 | 10,661 |
MMBtu
|
$1.78 |
TOTAL YEARLY COSTS | $200,643 | |||
RECOMMENDED SAVINGS* | $79,557 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $6,129 | $15,000 |
$5,966
64,844
kWh
|
$163
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,050 | $1,000 |
$1,050
11,410
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,566 | $1,000 |
$3,566
38,766
kWh
|
- | - | |
04 | 2.2514: Cover open tanks | $52,272 | $2,335 |
$48,867
531,167
kWh
|
$3,405
-
kW-mo/yr
|
- | |
05 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $2,899 | $2,835 |
$2,899
31,508
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,291 | $23,462 |
$7,291
79,253
kWh
|
- | - | |
07 | 2.7135: Install occupancy sensors | $2,449 | $630 |
$2,449
26,618
kWh
|
- | - | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $3,901 | $10,265 | - | - |
$3,901
-
MMBtu
|
|
TOTAL RECOMMENDED | $79,557 | $56,527 |
$72,088
783,566
kWh
|
$3,568
-
kW-mo/yr
|
$3,901
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs