| Assessment Year | 2015 |
|---|---|
| Principal Product | bread and rolls |
| NAICS | 311812: Commercial Bakeries |
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 183 |
| Plant Area |
60,000
ft2
|
| Annual Production | 68,668,823
lb
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $403,187 | 6,167,759 |
kWh
|
$0.065 |
| Natural Gas | $383,213 | 61,807 |
MMBtu
|
$6.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,221 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,985 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6218: Turn off equipment when not in use | $940 | $800 |
$940
14,480
kWh
|
- | |
| 02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,840 | $475 |
$1,840
28,305
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,057 | $2,000 |
$2,057
31,649
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,928 | $1,000 |
$5,928
91,202
kWh
|
- | |
| 05 | 2.4313: Provide proper maintenance of motor driven equipment | $479 | $200 |
$479
7,367
kWh
|
- | |
| 06 | 2.5121: Redesign flow to minimize mass transfer length | $195 | $1,000 |
$195
3,000
kWh
|
- | |
| 07 | 2.2414: Use waste heat from hot flue gases to preheat | $7,782 | $3,000 | - |
$7,782
-
MMBtu
|
|
| TOTAL RECOMMENDED | $19,221 | $8,475 |
$11,439
176,003
kWh
|
$7,782
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,985 | $3,000 |
$7,985
122,851
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs