ITAC Assessment: UM0461
ITAC logo
ITAC Assessment: UM0461
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product bread and rolls
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 183
Plant Area 60,000
ft2
Annual Production 68,668,823
lb
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $403,187 6,167,759
kWh
Natural Gas $383,213 61,807
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,985

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $940 $800 $940
14,480
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $1,840 $475 $1,840
28,305
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,057 $2,000 $2,057
31,649
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $5,928 $1,000 $5,928
91,202
kWh
-
05 2.4313: Provide proper maintenance of motor driven equipment $479 $200 $479
7,367
kWh
-
06 2.5121: Redesign flow to minimize mass transfer length $195 $1,000 $195
3,000
kWh
-
07 2.2414: Use waste heat from hot flue gases to preheat $7,782 $3,000 - $7,782
-
MMBtu
TOTAL RECOMMENDED $19,221 $8,475 $11,439
176,003
kWh
$7,782
-
MMBtu
TOTAL IMPLEMENTED $7,985 $3,000 $7,985
122,851
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs