ITAC Assessment: UM0460
ITAC logo
ITAC Assessment: UM0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product tools for the automotive suppliers
NAICS 333519: Rolling Mill and Other Metalworking Machinery Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 50,000
ft2
Annual Production 200,000
lb
Production Hrs. Annual 4,888
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,501 1,381,220
kWh
Electricity Demand $81,496 3,046
kW-mo/yr
Natural Gas $25,469 3,663
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,545 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,758

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,160 $1,100 $664
8,407
kWh
$496
-
kW-mo/yr
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,482 $3,500 $7,723
97,760
kWh
$5,768
-
kW-mo/yr
$(-4,009.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,526 $161,000 $15,185
192,222
kWh
$11,341
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $305 $1,000 $154
1,947
kWh
$115
-
kW-mo/yr
$36
-
MMBtu
05 2.7313: Recycle air for heating, ventilation and air conditioning $5,072 $4,000 - - $5,072
-
MMBtu
TOTAL RECOMMENDED $42,545 $170,600 $23,726
300,336
kWh
$17,720
-
kW-mo/yr
$1,099
-
MMBtu
TOTAL IMPLEMENTED $32,758 $166,100 $15,849
200,629
kWh
$11,837
-
kW-mo/yr
$5,072
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs