ITAC Assessment: UM0459
ITAC logo
ITAC Assessment: UM0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product glass fibre
NAICS 327993: Mineral Wool Manufacturing
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 63,000
ft2
Annual Production 59,463
ton
Production Hrs. Annual 7,020
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $732,620 18,024,194
kWh
Electricity Demand $800,797 34,532
kW-mo/yr
Natural Gas $814,523 160,507
MMBtu
Other Energy $4,543,479 243,696
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $415,848 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $299,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Energy Savings
01 2.2421: Install waste heat boiler to provide direct power $115,156 $525,000 $66,591
1,705,000
kWh
$68,134
-
kW-mo/yr
$(-19,569.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $982 $800 $509
12,730
kWh
$473
-
kW-mo/yr
- -
03 2.1133: Adjust burners for efficient operation $299,710 $30,000 - - - $299,710
-
MMBtu
TOTAL RECOMMENDED $415,848 $555,800 $67,100
1,717,730
kWh
$68,607
-
kW-mo/yr
$(-19,569.0)
-
MMBtu
$299,710
-
MMBtu
TOTAL IMPLEMENTED $299,710 $30,000 - - - $299,710
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs