ITAC Assessment: UM0452
ITAC logo
ITAC Assessment: UM0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product metal fabrication, steel parts
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 173,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,222 4,757,999
kWh
Electricity Demand $96,844 8,294
kW-mo/yr
Natural Gas $139,511 13,599
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,075

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $3,871 $1,000 $3,871
35,507
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $3,393 $2,500 $3,393
30,948
kWh
-
03 2.7313: Recycle air for heating, ventilation and air conditioning $28,779 $28,000 - $28,779
-
MMBtu
04 2.2437: Recover waste heat from equipment $2,903 $4,000 - $2,903
-
MMBtu
TOTAL RECOMMENDED $38,946 $35,500 $7,264
66,455
kWh
$31,682
-
MMBtu
TOTAL IMPLEMENTED $35,075 $34,500 $3,393
30,948
kWh
$31,682
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs