Assessment Year | 2015 |
---|---|
Principal Product | metal fabrication, steel parts |
NAICS | 332313: Plate Work Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
173,000
ft2
|
Annual Production | 5,000,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $516,222 | 4,757,999 |
kWh
|
$0.11 |
Electricity Demand | $96,844 | 8,294 |
kW-mo/yr
|
$11.68 |
Natural Gas | $139,511 | 13,599 |
MMBtu
|
$10.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,075 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,871 | $1,000 |
$3,871
35,507
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,393 | $2,500 |
$3,393
30,948
kWh
|
- | |
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $28,779 | $28,000 | - |
$28,779
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $2,903 | $4,000 | - |
$2,903
-
MMBtu
|
|
TOTAL RECOMMENDED | $38,946 | $35,500 |
$7,264
66,455
kWh
|
$31,682
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,075 | $34,500 |
$3,393
30,948
kWh
|
$31,682
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs