ITAC Assessment: UM0448
ITAC logo
ITAC Assessment: UM0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Automotive steel brackets
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 80,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $348,082 3,512,400
kWh
Natural Gas $301,093 43,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,750 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,995 $61,425 $49,995
504,996
kWh
-
02 2.4226: Use / purchase optimum sized compressor $11,310 $500 $11,310
114,240
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $4,336 $2,500 $4,336
43,795
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,564 $500 $3,564
36,000
kWh
-
05 2.2426: Use waste heat from flue gases to heat space conditioning air $7,545 $4,750 - $7,545
-
MMBtu
TOTAL RECOMMENDED $76,750 $69,675 $69,205
699,031
kWh
$7,545
-
MMBtu
TOTAL IMPLEMENTED $15,646 $3,000 $15,646
158,035
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs