ITAC Assessment: KU0541
ITAC logo
ITAC Assessment: KU0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product hauloffs, saws, tooling
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 102,500
ft2
Annual Production 1,860
pieces
Production Hrs. Annual 6,695
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,042 1,581,184
kWh
Electricity Demand $19,467 4,984
kW-mo/yr
Natural Gas $4,064 765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 $500 n/a $460
16,999
kWh
$140
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $490 $770 n/a $100
3,517
kWh
$20
-
kW-mo/yr
- $370 -
03 2.4231: Reduce the pressure of compressed air to the minimum required $300 $70 n/a $230
8,792
kWh
$70
-
kW-mo/yr
- - -
04 3.2172: Use automatic cleaning equipment $4,190 $1,000 n/a - - $4,190
-
gal
- -
05 2.8121: Apply for tax-free status for energy purchases $610 $200 n/a - - - - $610
TOTAL RECOMMENDED $6,190 $2,540 $790
29,308
kWh
$230
-
kW-mo/yr
$4,190
-
gal
$370 $610
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs