ITAC Assessment: SF0282
ITAC logo
ITAC Assessment: SF0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Chocolate Product
NAICS 311351: Chocolate and Confectionery Manufacturing from Cacao Beans
SIC 2066: Chocolate and Cocoa Products
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 120,000
ft2
Annual Production 0
lb
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $598,829 5,317,200
kWh
Electricity Demand $158,948 12,496
kW-mo/yr
Natural Gas $65,612 8,170
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $99,214 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,198 - $14,198
126,072
kWh
- - -
02 2.2111: Install steam trap $1,304 $299 $1,104
9,804
kWh
$200
-
kW-mo/yr
- -
03 2.4133: Use most efficient type of electric motors $7,053 $2,417 $5,919
52,564
kWh
$1,134
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $2,015 $1,440 $1,752
15,557
kWh
$263
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,516 $14,960 $8,905
79,073
kWh
$1,611
-
kW-mo/yr
- -
06 2.6231: Utilize controls to operate equipment only when needed $272 $571 $216
1,920
kWh
$56
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $442 $1,200 $274
2,433
kWh
$168
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,037 $5,155 $1,868
16,548
kWh
$169
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,517 $8,685 $2,135
18,960
kWh
$382
-
kW-mo/yr
- -
10 3.2111: Install redundant equipment to avoid losses caused by equipment failure and routine maintenance $34,944 $72 - - - $34,944
-
lb
11 3.6193: Install equipment (eg compactor) to reduce disposal costs $20,271 $21,650 - - - $20,271
-
lb
12 2.3212: Optimize plant power factor $3,645 $2,914 - - $3,645 -
TOTAL RECOMMENDED $99,214 $59,363 $36,371
322,931
kWh
$3,983
-
kW-mo/yr
$3,645 $55,215
-
lb
TOTAL IMPLEMENTED $57,941 $3,988 $21,495
190,873
kWh
$1,502
-
kW-mo/yr
- $34,944
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs