| Assessment Year | 2014 |
|---|---|
| Principal Product | Milk, cream, yogurt, sour cream, ice cream mix, egg nog |
| NAICS | 311511: Fluid Milk Manufacturing |
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 66 |
| Plant Area |
62,000
ft2
|
| Annual Production | 61,500,000
lb
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $479,242 | 4,225,420 |
kWh
|
$0.11 |
| Natural Gas | $234,814 | 52,500 |
MMBtu
|
$4.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $240,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $166,000 | $500,000 |
$198,000
1,750,000
kWh
|
$(-32,000.0)
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,060 | $9,750 |
$6,060
53,660
kWh
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,150 | $2,500 |
$2,150
19,020
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $28,000 | $50,000 | - |
$28,000
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $26,800 | $40,000 | - |
$26,800
-
MMBtu
|
|
| 06 | 2.2122: Install / repair insulation on condensate lines | $11,000 | $4,000 | - |
$11,000
-
MMBtu
|
|
| TOTAL RECOMMENDED | $240,010 | $606,250 |
$206,210
1,822,680
kWh
|
$33,800
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs