ITAC Assessment: UM0446
ITAC logo
ITAC Assessment: UM0446
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Milk, cream, yogurt, sour cream, ice cream mix, egg nog
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 62,000
ft2
Annual Production 61,500,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $479,242 4,225,420
kWh
Natural Gas $234,814 52,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $240,010 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $166,000 $500,000 $198,000
1,750,000
kWh
$(-32,000.0)
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,060 $9,750 $6,060
53,660
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $2,150 $2,500 $2,150
19,020
kWh
-
04 2.2437: Recover waste heat from equipment $28,000 $50,000 - $28,000
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $26,800 $40,000 - $26,800
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $11,000 $4,000 - $11,000
-
MMBtu
TOTAL RECOMMENDED $240,010 $606,250 $206,210
1,822,680
kWh
$33,800
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs