ITAC Assessment: GT0906
ITAC logo
ITAC Assessment: GT0906
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Plastic bottles
NAICS 326160: Plastics Bottle Manufacturing
SIC 3085: Plastics Bottles
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 21,524,177
units
Production Hrs. Annual 6,240
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,258,030 13,626,880
kWh
Waste Disposal Costs
Water Usage $45,891 5,629
Tgal
TOTAL YEARLY COSTS $1,303,921
RECOMMENDED SAVINGS* $218,318 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,404

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $3,227 $1,200 $3,227
35,078
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,228 $13,889 $23,228
252,479
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $949 $1,754 $949
10,314
kWh
04 2.2511: Insulate bare equipment $149 $304 $149
1,620
kWh
05 2.9114: Use solar heat to make electricty $190,765 $2,426,160 $190,765
2,066,361
kWh
TOTAL RECOMMENDED $218,318 $2,443,307 $218,318
2,365,852
kWh
TOTAL IMPLEMENTED $27,404 $16,843 $27,404
297,871
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs