| Assessment Year | 2014 |
|---|---|
| Principal Product | Hydrolic fittings |
| NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
| SIC | 3492: Fluid Power Valves and Hose Fittings |
| Sales Range | $10 M to 50M |
| # of Employees | 122 |
| Plant Area |
52,400
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Indiana |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $258,690 | 3,346,231 |
kWh
|
$0.077 |
| Natural Gas | $23,004 | 3,339 |
MMBtu
|
$6.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $90,983 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,114 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $73,169 | $180,000 |
$110,156
1,436,000
kWh
|
$(-36,987.0)
-
MMBtu
|
|
| 02 | 2.4322: Use or replace with energy efficient substitutes | $13,700 | $14,400 |
$21,970
288,000
kWh
|
$(-8,270.0)
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,664 | $2,500 |
$2,664
34,933
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,450 | $3,480 |
$1,450
17,664
kWh
|
- | |
| TOTAL RECOMMENDED | $90,983 | $200,380 |
$136,240
1,776,597
kWh
|
$(-45,257.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $4,114 | $5,980 |
$4,114
52,597
kWh
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs