ITAC Assessment: UM0441
ITAC logo
ITAC Assessment: UM0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Hydrolic fittings
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 52,400
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,690 3,346,231
kWh
Natural Gas $23,004 3,339
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,983 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,114

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $73,169 $180,000 $110,156
1,436,000
kWh
$(-36,987.0)
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $13,700 $14,400 $21,970
288,000
kWh
$(-8,270.0)
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,664 $2,500 $2,664
34,933
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,450 $3,480 $1,450
17,664
kWh
-
TOTAL RECOMMENDED $90,983 $200,380 $136,240
1,776,597
kWh
$(-45,257.0)
-
MMBtu
TOTAL IMPLEMENTED $4,114 $5,980 $4,114
52,597
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs