ITAC Assessment: OK0099
ITAC logo
ITAC Assessment: OK0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product BRICKS AND TILE
NAICS
n/a
SIC 3251: Brick and Structural Clay Tile
Sales Range $5
M
to 10
M
# of Employees 12
Plant Area
n/a
Annual Production 2,480,000
pieces
Production Hrs. Annual 2,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,220 405,920
kWh
Natural Gas $182,617 69,816
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,074 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $125 $143 $125
2,638
kWh
-
02 2.4133: Use most efficient type of electric motors $215 $600 $215
4,396
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $19,530 $3,400 - $19,530
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $145 $498 $145
5,275
kWh
-
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $393 $52 - $393
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $548 $25 $548
19,930
kWh
-
07 2.5194: Redesign process $3,330 $6,464 - $3,330
-
MMBtu
08 2.2511: Insulate bare equipment $4,569 $2,544 - $4,569
-
MMBtu
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,219 $70 $1,219
43,962
kWh
-
TOTAL RECOMMENDED $30,074 $13,796 $2,252
76,201
kWh
$27,822
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs