| Assessment Year | 1983 |
|---|---|
| Principal Product | BRICKS AND TILE |
| NAICS |
n/a
|
| SIC | 3251: Brick and Structural Clay Tile |
| Sales Range | $5 M to 10M |
| # of Employees | 12 |
| Plant Area |
n/a
|
| Annual Production | 2,480,000
pieces
|
| Production Hrs. Annual | 2,160
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $24,220 | 405,920 |
kWh
|
$0.060 |
| Natural Gas | $182,617 | 69,816 |
MMBtu
|
$2.62 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,074 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $125 | $143 |
$125
2,638
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $215 | $600 |
$215
4,396
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $19,530 | $3,400 | - |
$19,530
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $145 | $498 |
$145
5,275
kWh
|
- | |
| 05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $393 | $52 | - |
$393
-
MMBtu
|
|
| 06 | 2.6212: Turn off equipment during breaks, reduce operating time | $548 | $25 |
$548
19,930
kWh
|
- | |
| 07 | 2.5194: Redesign process | $3,330 | $6,464 | - |
$3,330
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $4,569 | $2,544 | - |
$4,569
-
MMBtu
|
|
| 09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,219 | $70 |
$1,219
43,962
kWh
|
- | |
| TOTAL RECOMMENDED | $30,074 | $13,796 |
$2,252
76,201
kWh
|
$27,822
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs