ITAC Assessment: UM0439
ITAC logo
ITAC Assessment: UM0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Automotive Fuel and Brake Tubing
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 433
Plant Area 190,000
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $733,000 10,023,119
kWh
Electricity Demand $237,274 20,234
kW-mo/yr
Natural Gas $57,713 7,465
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,136 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,162

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $32,824 $20,000 $17,442
238,600
kWh
$19,988
-
kW-mo/yr
$(-4,606.0)
-
MMBtu
02 2.4322: Use or replace with energy efficient substitutes $10,150 $21,000 $12,630
172,500
kWh
$4,050
-
kW-mo/yr
$(-6,530.0)
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $8,596 $2,500 $8,596
117,595
kWh
- -
04 2.2437: Recover waste heat from equipment $27,566 $4,000 - - $27,566
-
MMBtu
TOTAL RECOMMENDED $79,136 $47,500 $38,668
528,695
kWh
$24,038
-
kW-mo/yr
$16,430
-
MMBtu
TOTAL IMPLEMENTED $36,162 $6,500 $8,596
117,595
kWh
- $27,566
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs