Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product ball bearings
NAICS
n/a
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 55,721
ft2
Annual Production 3,000,000,000
pieces
Production Hrs. Annual 7,056
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $328,581 3,820,340
kWh
Natural Gas $160,627 24,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,935 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.8113: Purchase gas directly from a contract gas supplier $32,481 $19,668 - $32,481
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $8,546 - $8,546
99,355
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,588 $5,514 $4,588
53,341
kWh
-
04 2.2511: Insulate bare equipment $11,128 $4,920 - $11,128
-
MMBtu
05 2.4131: Size electric motors for peak operating efficiency $2,158 $7,565 $2,158
25,205
kWh
-
06 2.7135: Install occupancy sensors $1,034 - $1,034
12,016
kWh
-
TOTAL RECOMMENDED $59,935 $37,667 $16,326
189,917
kWh
$43,609
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs