ITAC Assessment: UM0438
ITAC logo
ITAC Assessment: UM0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Hydrolic fittings coating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 27,000
ft2
Annual Production 85,000,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $227,000 2,600,000
kWh
Natural Gas $47,000 6,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $123,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $2,260 $350 $2,260
26,589
kWh
-
02 2.4239: Eliminate or reduce compressed air usage $945 $600 $945
10,738
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $22,608 $7,500 $34,496
392,000
kWh
$(-11,888.0)
-
MMBtu
04 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $98,045 $175,000 $173,302
1,956,000
kWh
$(-75,257.0)
-
MMBtu
TOTAL RECOMMENDED $123,858 $183,450 $211,003
2,385,327
kWh
$(-87,145.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs