ITAC Assessment: UM0432
ITAC logo
ITAC Assessment: UM0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Medical equipment and supplies
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 338
Plant Area 63,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $523,782 6,063,000
kWh
Electricity Demand $104,768 11,719
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2612: Use cooling tower water instead of refrigeration $10,000 $10,000 $7,000
80,000
kWh
$3,000
-
kW-mo/yr
02 2.3212: Optimize plant power factor $8,484 $15,000 $7,071
81,850
kWh
$1,413
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,532 $200 $2,532
29,304
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $1,790 $2,500 $1,790
20,720
kWh
-
TOTAL RECOMMENDED $22,806 $27,700 $18,393
211,874
kWh
$4,413
-
kW-mo/yr
TOTAL IMPLEMENTED $14,322 $12,700 $11,322
130,024
kWh
$3,000
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs