Assessment Year | 2013 |
---|---|
Principal Product | Reinforced fiberglass products |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
150,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $597,886 | 5,491,116 |
kWh
|
$0.11 |
Electricity Demand | $196,447 | 14,052 |
kW-mo/yr
|
$13.98 |
Natural Gas | $121,134 | 17,603 |
MMBtu
|
$6.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,011 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $25,011 | $30,000 |
$10,774
98,840
kWh
|
$3,537
-
kW-mo/yr
|
$10,700 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,730 | $38,000 |
$15,691
143,952
kWh
|
$6,039
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,100 | $200 |
$5,100
46,800
kWh
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $4,832 | $2,500 |
$4,832
44,333
kWh
|
- | - | |
TOTAL RECOMMENDED | $56,673 | $70,700 |
$36,397
333,925
kWh
|
$9,576
-
kW-mo/yr
|
$10,700 | ||
TOTAL IMPLEMENTED | $25,011 | $30,000 |
$10,774
98,840
kWh
|
$3,537
-
kW-mo/yr
|
$10,700 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs