Assessment Year 2013
Principal Product Reinforced fiberglass products
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3711: Motor Vehicles and Passenger Car Bodies
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 150,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $597,886 5,491,116
kWh
Electricity Demand $196,447 14,052
kW-mo/yr
Natural Gas $121,134 17,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,011

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $25,011 $30,000 $10,774
98,840
kWh
$3,537
-
kW-mo/yr
$10,700
02 2.7142: Utilize higher efficiency lamps and/or ballasts $21,730 $38,000 $15,691
143,952
kWh
$6,039
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,100 $200 $5,100
46,800
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $4,832 $2,500 $4,832
44,333
kWh
- -
TOTAL RECOMMENDED $56,673 $70,700 $36,397
333,925
kWh
$9,576
-
kW-mo/yr
$10,700
TOTAL IMPLEMENTED $25,011 $30,000 $10,774
98,840
kWh
$3,537
-
kW-mo/yr
$10,700
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs