ITAC Assessment: SU0122
ITAC logo
ITAC Assessment: SU0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Zinc Die-Castings
NAICS
n/a
SIC 3364: Nonferrous Die-Castings, Except Aluminum
Sales Range n/a
# of Employees 162
Plant Area 95,456
ft2
Annual Production 9,072,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $519,566 10,100,020
kWh
Electricity Demand $138,578 19,464
kW-mo/yr
Electricity Fees $162,642 -
Natural Gas $151,934 25,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,360 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (non-haz) Savings One-time Revenue or Avoided Cost Savings
01 3.8134: Use water-based cutting fluids to eliminate need for solvent cleaning $18,489 - - $18,489
-
gal
-
02 2.8114: Change rate schedules or other changes in utility service $4,468 - - - $4,468
03 2.6218: Turn off equipment when not in use $486 - $486
6,075
kWh
- -
04 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $15,879 - $15,879
198,487
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $38 - $38
477
kWh
- -
TOTAL RECOMMENDED $39,360 - $16,403
205,039
kWh
$18,489
-
gal
$4,468
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs