Assessment Year | 2013 |
---|---|
Principal Product | Various metal plating processes |
NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
Sales Range | $5 M to 10M |
# of Employees | 52 |
Plant Area |
20,000
ft2
|
Annual Production | 90,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,803 | 1,682,240 |
kWh
|
$0.055 |
Electricity Demand | $82,432 | 3,680 |
kW-mo/yr
|
$22.40 |
Natural Gas | $177,599 | 39,205 |
MMBtu
|
$4.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,646 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,909 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $74,405 | $210,000 |
$82,467
1,499,400
kWh
|
$47,040
-
kW-mo/yr
|
$(-55,102.0)
-
MMBtu
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $1,106 | $1,500 |
$1,106
20,106
kWh
|
- | - | |
03 | 2.6218: Turn off equipment when not in use | $990 | $100 |
$990
17,993
kWh
|
- | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $636 | $1,200 |
$636
11,567
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $4,177 | $9,000 | - | - |
$4,177
-
MMBtu
|
|
06 | 2.1113: Reduce combustion air flow to optimum | $1,332 | $500 | - | - |
$1,332
-
MMBtu
|
|
TOTAL RECOMMENDED | $82,646 | $222,300 |
$85,199
1,549,066
kWh
|
$47,040
-
kW-mo/yr
|
$(-49,593.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,909 | $11,800 |
$2,732
49,666
kWh
|
- |
$4,177
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs