ITAC Assessment: UM0422
ITAC logo
ITAC Assessment: UM0422
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product screw machine and CNC products
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 1,000,000
ft2
Annual Production 520,000,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,280 1,146,720
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,226

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $31,550 $15,331 $31,550
239,011
kWh
02 2.4221: Install compressor air intakes in coolest locations $2,633 $500 $2,633
19,949
kWh
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $29,593 $14,120 $29,593
224,192
kWh
TOTAL RECOMMENDED $63,776 $29,951 $63,776
483,152
kWh
TOTAL IMPLEMENTED $32,226 $14,620 $32,226
244,141
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs