Assessment Year | 2012 |
---|---|
Principal Product | sheet metal,parts,tooling, tamping |
NAICS | 332439: Other Metal Container Manufacturing |
SIC | 3469: Metal Stampings, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 146 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 5,600
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $448,106 | 4,976,230 |
kWh
|
$0.090 |
Electricity Demand | $106,210 | 42,484 |
kW-mo/yr
|
$2.50 |
Natural Gas | $167,204 | 22,865 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,104 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,422 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $8,072 | $4,000 |
$8,072
89,690
kWh
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $822 | $875 |
$822
9,128
kWh
|
- | - | - | |
03 | 2.3212: Optimize plant power factor | $12,081 | $20,000 |
$8,135
90,394
kWh
|
$430
-
kW-mo/yr
|
- | $3,516 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,832 | $10,965 |
$1,832
20,341
kWh
|
- | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $23,600 | $1,000 | - | - |
$23,600
-
MMBtu
|
- | |
06 | 2.2511: Insulate bare equipment | $1,697 | $1,500 | - | - |
$1,697
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $48,104 | $38,340 |
$18,861
209,553
kWh
|
$430
-
kW-mo/yr
|
$25,297
-
MMBtu
|
$3,516 | ||
TOTAL IMPLEMENTED | $24,422 | $1,875 |
$822
9,128
kWh
|
- |
$23,600
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs