ITAC Assessment: UM0415
ITAC logo
ITAC Assessment: UM0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product sheet metal,parts,tooling, tamping
NAICS 332439: Other Metal Container Manufacturing
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 146
Plant Area 100,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 5,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $448,106 4,976,230
kWh
Electricity Demand $106,210 42,484
kW-mo/yr
Natural Gas $167,204 22,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,104 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,422

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $8,072 $4,000 $8,072
89,690
kWh
- - -
02 2.7135: Install occupancy sensors $822 $875 $822
9,128
kWh
- - -
03 2.3212: Optimize plant power factor $12,081 $20,000 $8,135
90,394
kWh
$430
-
kW-mo/yr
- $3,516
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,832 $10,965 $1,832
20,341
kWh
- - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $23,600 $1,000 - - $23,600
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,697 $1,500 - - $1,697
-
MMBtu
-
TOTAL RECOMMENDED $48,104 $38,340 $18,861
209,553
kWh
$430
-
kW-mo/yr
$25,297
-
MMBtu
$3,516
TOTAL IMPLEMENTED $24,422 $1,875 $822
9,128
kWh
- $23,600
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs