ITAC Assessment: HO0116
ITAC logo
ITAC Assessment: HO0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Candles
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 35,500
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 1,940
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,962 118,406
kWh
Natural Gas $22,651 3,382
MMBtu
Fuel Oil #2 $15,235 2,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,234 $761 $1,234
5,862
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $247 $374 $247
1,172
kWh
- - -
03 2.4133: Use most efficient type of electric motors $151 $305 $151
879
kWh
- - -
04 2.2136: Install / repair insulation on steam lines $96 $53 - $56
-
MMBtu
$40
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $229 $500 $229
1,172
kWh
- - -
06 2.1232: Keep boiler tubes clean $2,908 $3,000 - $1,697
-
MMBtu
$1,211
-
MMBtu
-
07 2.8112: Combine utility meters $400 - - - - $400
08 2.8121: Apply for tax-free status for energy purchases $565 - - - - $565
TOTAL RECOMMENDED $5,830 $4,993 $1,861
9,085
kWh
$1,753
-
MMBtu
$1,251
-
MMBtu
$965
TOTAL IMPLEMENTED $400 - - - - $400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs