ITAC Assessment: UF0144
ITAC logo
ITAC Assessment: UF0144
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Animal Feed
NAICS
n/a
SIC 2048: Prepared Feed and Feed Ingredients for Animals and Fowls, Except Dogs and Cats
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 30,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,707 1,247,362
kWh
Electricity Demand $52,963 5,180
kW-mo/yr
Natural Gas $8,927 1,710
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $95,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,468 $2,440 $1,012
19,930
kWh
$456
-
kW-mo/yr
- - - - -
02 2.4133: Use most efficient type of electric motors $81 $444 $81
4,396
kWh
- - - - - -
03 2.3212: Optimize plant power factor $16,942 $15,758 - - $16,942 - - - -
04 2.4131: Size electric motors for peak operating efficiency $707 $(-7,300.0) $507
9,965
kWh
$200
-
kW-mo/yr
- - - - -
05 3.1191: Change procedures / equipment / operating conditions $76,086 $125,114 $(-2,473.0)
(-26,377)
kWh
- - $32,880 - $3,679 $42,000
06 3.5315: Lease / purchase baler; sell cardboard to recycler $274 - - - - - $274 - -
TOTAL RECOMMENDED $95,558 $136,456 $(-873.0)
7,914
kWh
$656
-
kW-mo/yr
$16,942 $32,880 $274 $3,679 $42,000
TOTAL IMPLEMENTED $1,549 $2,884 $1,093
24,326
kWh
$456
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs