Assessment Year | 2012 |
---|---|
Principal Product | metallic fittings |
NAICS | 332919: Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 72 |
Plant Area |
100,000
ft2
|
Annual Production | 100,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,363 | 1,505,400 |
kWh
|
$0.083 |
Electricity Demand | $35,502 | 3,970 |
kW-mo/yr
|
$8.94 |
Natural Gas | $43,334 | 6,526 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,438 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4235: Remove or close off unneeded compressed air lines | $3,930 | $1,000 |
$3,930
47,179
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $3,595 | $1,000 |
$3,595
43,160
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,508 | $2,500 |
$2,079
24,960
kWh
|
$429
-
kW-mo/yr
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,256 | $200 |
$2,256
27,955
kWh
|
- | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,975 | $1,500 |
$1,637
19,656
kWh
|
$338
-
kW-mo/yr
|
|
06 | 2.6211: Conserve energy by efficient use of vending machines | $566 | $100 |
$566
6,800
kWh
|
- | |
TOTAL RECOMMENDED | $14,830 | $6,300 |
$14,063
169,710
kWh
|
$767
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $6,438 | $3,500 |
$6,009
72,139
kWh
|
$429
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs