ITAC Assessment: UM0412
ITAC logo
ITAC Assessment: UM0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Blow Molding Equipment
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,862 2,509,604
kWh
Natural Gas $97,569 11,878
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $874 $1,000 $874
7,670
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,308 $2,850 $6,308
55,340
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $775 $100 $775
6,800
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,482 $600 $1,482
13,000
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,923 $1,300 $4,923
43,192
kWh
-
06 2.7243: Improve air circulation with destratification fans / other methods $4,939 $4,000 - $4,939
-
MMBtu
TOTAL RECOMMENDED $19,301 $9,850 $14,362
126,002
kWh
$4,939
-
MMBtu
TOTAL IMPLEMENTED $12,105 $5,150 $12,105
106,202
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs