ITAC Assessment: UM0411
ITAC logo
ITAC Assessment: UM0411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Arizona Tea, apple sauce
NAICS 311421: Fruit and Vegetable Canning
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 116
Plant Area 114,897
ft2
Annual Production 3,700,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $291,000 3,614,906
kWh
Natural Gas $301,500 49,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $821

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $4,396 $2,000 $4,396
54,609
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,402 $200 $2,402
29,840
kWh
-
03 2.4322: Use or replace with energy efficient substitutes $821 $100 $821
10,200
kWh
-
04 2.3416: Use combined cycle gas turbine generator sets with waste heat boilers connected to turbine exhaust $56,000 $225,000 $56,000
700,000
kWh
-
05 2.2424: Use heat in flue gases to preheat products or materials $15,341 $5,000 - $15,341
-
MMBtu
TOTAL RECOMMENDED $78,960 $232,300 $63,619
794,649
kWh
$15,341
-
MMBtu
TOTAL IMPLEMENTED $821 $100 $821
10,200
kWh
-