Assessment Year | 1989 |
---|---|
Principal Product | CORRUGATED CONTAINERS |
NAICS |
n/a
|
SIC | 2653: Corrugated and Solid Fiber Boxes |
Sales Range | $10 M to 50M |
# of Employees | 117 |
Plant Area |
n/a
|
Annual Production | 6,000
thousand feet
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $217,470 | 4,346,131 |
kWh
|
$0.050 |
Natural Gas | $158,500 | 43,227 |
MMBtu
|
$3.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $52,222 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,244 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,000 | $270 | - |
$7,000
-
MMBtu
|
|
02 | 2.3212: Optimize plant power factor | $18,950 | $29,790 |
$18,950
-
kWh
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $14,660 | $19,050 |
$(-1,270.0)
(-30,774)
kWh
|
$15,930
-
MMBtu
|
|
04 | 2.2511: Insulate bare equipment | $2,990 | $1,000 | - |
$2,990
-
MMBtu
|
|
05 | 2.2135: Repair and eliminate steam leaks | $3,029 | $840 | - |
$3,029
-
MMBtu
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,490 | $540 |
$2,490
60,082
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,275 | $500 |
$2,275
84,994
kWh
|
- | |
08 | 2.4312: Improve lubrication practices | $745 | - |
$745
27,843
kWh
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83 | $80 |
$83
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $52,222 | $52,070 |
$23,273
143,317
kWh
|
$28,949
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,244 | $32,400 |
$21,225
84,994
kWh
|
$13,019
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs