ITAC Assessment: UM0410
ITAC logo
ITAC Assessment: UM0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Parts for heavy duty truck axles and drivetrains
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 80,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $304,071 3,791,410
kWh
Electricity Demand $14,889 10,198
kW-mo/yr
Natural Gas $30,780 16,901
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,461 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,779

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3212: Optimize plant power factor $7,109 $20,000 $6,827
71,658
kWh
$282
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,453 $11,580 $6,246
77,880
kWh
$207
-
kW-mo/yr
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,779 $100 $2,779
34,650
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $2,438 $2,000 $2,438
30,402
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $682 $10 $682
8,500
kWh
-
TOTAL RECOMMENDED $19,461 $33,690 $18,972
223,090
kWh
$489
-
kW-mo/yr
TOTAL IMPLEMENTED $2,779 $100 $2,779
34,650
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs