ITAC Assessment: KG0038
ITAC logo
ITAC Assessment: KG0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Folding Cartons,Set Up Boxes,Photo Albums & Loose Leaf Paper
NAICS
n/a
SIC 2782: Blankbooks, Looseleaf Binders and Devices
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 75,000,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 2,431
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,685 633,939
kWh
Natural Gas $798 191
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,453 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7261: Install timers and/or thermostats $3,010 $1,050 $3,010
55,686
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,449 $722 $1,449
21,981
kWh
03 2.4133: Use most efficient type of electric motors $1,105 $2,250 $1,105
17,292
kWh
04 2.7229: Air condition only space necessary $936 $1,744 $936
17,292
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $370 $40 $370
5,569
kWh
06 2.4314: Use synthetic lubricant $296 - $296
4,396
kWh
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $287 $375 $287
5,275
kWh
TOTAL RECOMMENDED $7,453 $6,181 $7,453
127,491
kWh
TOTAL IMPLEMENTED $6,517 $4,437 $6,517
110,199
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs