ITAC Assessment: KU0405
ITAC logo
ITAC Assessment: KU0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Fifth Wheel Recreation Vehicles
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 1,401
pieces
Production Hrs. Annual 2,370
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $54,164 852,579
kWh
Natural Gas $35,218 9,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,142 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,108

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,867 $475 $2,867
45,135
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $242 $200 $242
3,810
kWh
- -
03 2.2437: Recover waste heat from equipment $156 $651 - $156
-
MMBtu
-
04 2.8113: Purchase gas directly from a contract gas supplier $2,618 - - - $2,618
05 2.7111: Reduce illumination to minimum necessary levels $354 $520 $354
5,569
kWh
- -
06 2.7135: Install occupancy sensors $571 $1,800 $571
9,086
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $93 $340 $93
1,465
kWh
- -
08 2.6121: Reduce hot water temperature to the minimum required $241 - - $241
-
MMBtu
-
TOTAL RECOMMENDED $7,142 $3,986 $4,127
65,065
kWh
$397
-
MMBtu
$2,618
TOTAL IMPLEMENTED $3,108 $475 $2,867
45,135
kWh
$241
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs