| Assessment Year | 1993 |
|---|---|
| Principal Product | Fifth Wheel Recreation Vehicles |
| NAICS |
n/a
|
| SIC | 3792: Travel Trailers and Campers |
| Sales Range | $10 M to 50M |
| # of Employees | 280 |
| Plant Area |
n/a
|
| Annual Production | 1,401
pieces
|
| Production Hrs. Annual | 2,370
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $54,164 | 852,579 |
kWh
|
$0.064 |
| Natural Gas | $35,218 | 9,046 |
MMBtu
|
$3.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,142 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,108 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,867 | $475 |
$2,867
45,135
kWh
|
- | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $242 | $200 |
$242
3,810
kWh
|
- | - | |
| 03 | 2.2437: Recover waste heat from equipment | $156 | $651 | - |
$156
-
MMBtu
|
- | |
| 04 | 2.8113: Purchase gas directly from a contract gas supplier | $2,618 | - | - | - | $2,618 | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $354 | $520 |
$354
5,569
kWh
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $571 | $1,800 |
$571
9,086
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $93 | $340 |
$93
1,465
kWh
|
- | - | |
| 08 | 2.6121: Reduce hot water temperature to the minimum required | $241 | - | - |
$241
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $7,142 | $3,986 |
$4,127
65,065
kWh
|
$397
-
MMBtu
|
$2,618 | ||
| TOTAL IMPLEMENTED | $3,108 | $475 |
$2,867
45,135
kWh
|
$241
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs