ITAC Assessment: UM0408
ITAC logo
ITAC Assessment: UM0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product steel coils
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 107
Plant Area 200,000
ft2
Annual Production 40,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $240,365 3,435,825
kWh
Electricity Demand $112,764 9,524
kW-mo/yr
Natural Gas $42,033 5,043
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,446 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,433

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $13,566 $16,700 $14,241
203,445
kWh
$(-675.0)
-
kW-mo/yr
- -
02 2.3132: Recharge batteries on during off-peak demand periods $10,324 $2,000 - - $10,324 -
03 2.4221: Install compressor air intakes in coolest locations $2,021 $1,500 $2,021
28,875
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,447 $200 $1,447
20,685
kWh
- - -
05 2.6211: Conserve energy by efficient use of vending machines $595 $100 $595
8,500
kWh
- - -
06 2.7291: Reschedule and rearrange multiple-source heating systems $1,364 - - - - $1,364
-
MMBtu
07 2.7221: Lower temperature during the winter season and vice-versa $1,129 $1,000 - - - $1,129
-
MMBtu
TOTAL RECOMMENDED $30,446 $21,500 $18,304
261,505
kWh
$(-675.0)
-
kW-mo/yr
$10,324 $2,493
-
MMBtu
TOTAL IMPLEMENTED $15,433 $4,600 $2,616
37,375
kWh
- $10,324 $2,493
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs