ITAC Assessment: UM0407
ITAC logo
ITAC Assessment: UM0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Steel automotive parts: weldments and assemblies
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $50
M
to 100
M
# of Employees 167
Plant Area 187,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,885 2,938,715
kWh
Electricity Demand $102,523 8,659
kW-mo/yr
Natural Gas $68,090 8,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,127 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,694

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $7,773 $15,000 $9,052
128,584
kWh
$(-1,279.0)
-
kW-mo/yr
- -
02 2.3132: Recharge batteries on during off-peak demand periods $6,427 $2,000 - - $6,427 -
03 2.4131: Size electric motors for peak operating efficiency $6,006 $8,000 $4,418
62,760
kWh
$1,588
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,966 $200 $3,966
56,330
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,660 $1,500 $1,660
23,575
kWh
- - -
06 2.6211: Conserve energy by efficient use of vending machines $480 $100 $480
6,800
kWh
- - -
07 2.7135: Install occupancy sensors $44 $20 $44
624
kWh
- - -
08 2.7244: Revise smoke cleanup from operations $29,650 $25,800 - - - $29,650
-
MMBtu
09 2.2437: Recover waste heat from equipment $6,121 $1,000 - - - $6,121
-
MMBtu
TOTAL RECOMMENDED $62,127 $53,620 $19,620
278,673
kWh
$309
-
kW-mo/yr
$6,427 $35,771
-
MMBtu
TOTAL IMPLEMENTED $20,694 $12,600 $6,558
93,135
kWh
$1,588
-
kW-mo/yr
$6,427 $6,121
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs