Assessment Year | 2013 |
---|---|
Principal Product | Large Caliber Ammunition Metal Parts |
NAICS | 332993: Ammunition (except Small Arms) Manufacturing |
SIC | 3483: Ammunition, Except for Small Arms |
Sales Range | $50 M to 100M |
# of Employees | 190 |
Plant Area |
500,000
ft2
|
Annual Production | 22,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,144,030 | 30,629,000 |
kWh
|
$0.070 |
Natural Gas | $1,110,999 | 228,224 |
MMBtu
|
$4.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $561,460 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $264,361 | $119,173 |
$262,587
3,751,239
kWh
|
- | $1,774 | |
02 | 2.2515: Use optimum thickness insulation | $45,077 | $26,012 | - |
$45,077
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $2,504 | $1,586 | - |
$2,504
-
MMBtu
|
- | |
04 | 3.1161: Eliminate/reduce an operation | $13,661 | - | - | - | $13,661 | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $92,173 | $61,200 |
$92,173
1,316,752
kWh
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,758 | $10,000 |
$3,758
53,688
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $42,595 | $169,520 |
$42,595
608,502
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,664 | $1,000 |
$5,664
80,917
kWh
|
- | - | |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,762 | $6,498 |
$3,762
53,753
kWh
|
- | - | |
10 | 2.2135: Repair and eliminate steam leaks | $51,910 | $52,314 | - |
$51,910
-
MMBtu
|
- | |
11 | 2.2136: Install / repair insulation on steam lines | $17,390 | $6,750 | - |
$17,390
-
MMBtu
|
- | |
12 | 2.2442: Preheat combustion air with waste heat | $13,454 | $60,000 | - |
$13,454
-
MMBtu
|
- | |
13 | 2.1211: Move boiler to more efficient location | $721 | $2,000 | - |
$721
-
MMBtu
|
- | |
14 | 2.4322: Use or replace with energy efficient substitutes | $3,188 | $11,909 |
$3,188
45,552
kWh
|
- | - | |
15 | 2.7261: Install timers and/or thermostats | $1,242 | $2,400 |
$1,242
17,736
kWh
|
- | - | |
TOTAL RECOMMENDED | $561,460 | $530,362 |
$414,969
5,928,139
kWh
|
$131,056
-
MMBtu
|
$15,435 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs