| Assessment Year | 2012 |
|---|---|
| Principal Product | Automotive metal stampings and welded assemblies |
| NAICS | 336370: Motor Vehicle Metal Stamping |
| SIC | 3465: Automotive Stampings |
| Sales Range | $50 M to 100M |
| # of Employees | 413 |
| Plant Area |
500,000
ft2
|
| Annual Production | 12,000,000
pieces
|
| Production Hrs. Annual | 8,112
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,670,326 | 34,150,558 |
kWh
|
$0.049 |
| Electricity Demand | $604,542 | 66,312 |
kW-mo/yr
|
$9.12 |
| Natural Gas | $263,129 | 50,264 |
MMBtu
|
$5.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $154,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,438 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $48,738 | $10,000 |
$48,738
996,694
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,375 | $7,720 |
$19,104
390,674
kWh
|
$5,271
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $12,063 | $3,600 |
$12,063
246,694
kWh
|
- | - | |
| 04 | 2.1113: Reduce combustion air flow to optimum | $37,146 | $1,000 | - | - |
$37,146
-
MMBtu
|
|
| 05 | 2.1116: Improve combustion control capability | $16,585 | $25,000 | - | - |
$16,585
-
MMBtu
|
|
| 06 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $15,780 | $10,000 | - | - |
$15,780
-
MMBtu
|
|
| TOTAL RECOMMENDED | $154,687 | $57,320 |
$79,905
1,634,062
kWh
|
$5,271
-
kW-mo/yr
|
$69,511
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $36,438 | $11,320 |
$31,167
637,368
kWh
|
$5,271
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs