Assessment Year | 2008 |
---|---|
Principal Product | Healthy and Organic Snacks |
NAICS | 311919: Other Snack Food Manufacturing |
SIC | 2096: Potato Chips, Corn Chips, and Similar Snacks |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
350,000
ft2
|
Annual Production | 22,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $437,900 | 5,927,727 |
kWh
|
$0.074 |
Electricity Demand | $146,528 | 17,001 |
kW-mo/yr
|
$8.62 |
Electricity Fees | $23,062 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $152,651 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,237 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.812: Apply for investment incentives | $67,532 | - | - | - | $67,532 | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $21,466 | - | - |
$21,466
-
kW-mo/yr
|
- | |
03 | 2.3137: Use power during off-peak periods | $19,882 | - | - | - | $19,882 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,013 | - |
$6,482
88,800
kWh
|
$1,531
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $4,164 | $173 |
$3,373
46,200
kWh
|
$791
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $2,414 | $535 |
$2,414
33,075
kWh
|
- | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,418 | $1,650 |
$9,242
126,600
kWh
|
$2,176
-
kW-mo/yr
|
- | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,762 | $31,086 |
$14,365
196,800
kWh
|
$3,397
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $152,651 | $33,444 |
$35,876
491,475
kWh
|
$29,361
-
kW-mo/yr
|
$87,414 | ||
TOTAL IMPLEMENTED | $65,237 | $33,444 |
$35,876
491,475
kWh
|
$29,361
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs