ITAC Assessment: UM0405
ITAC logo
ITAC Assessment: UM0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Large automotive assemblies
NAICS 336211: Motor Vehicle Body Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 475
Plant Area 154,000
ft2
Annual Production 9,184,845
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $246,196 2,204,472
kWh
Natural Gas $73,177 9,150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,849 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,465

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $3,384 $2,000 $3,384
28,198
kWh
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,465 $1,400 $2,465
20,544
kWh
TOTAL RECOMMENDED $5,849 $3,400 $5,849
48,742
kWh
TOTAL IMPLEMENTED $2,465 $1,400 $2,465
20,544
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs