ITAC Assessment: SF0136
ITAC logo
ITAC Assessment: SF0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Wood & Upholstery Furniture
NAICS
n/a
SIC 2531: Public Building and Related Furniture
Sales Range $10
M
to 50
M
# of Employees 118
Plant Area 60,000
ft2
Annual Production 220,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,086 1,083,236
kWh
Electricity Demand $21,035 3,965
kW-mo/yr
Natural Gas $8,448 1,268
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,535 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $170,132

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,673 - $3,394
53,048
kWh
$279
-
kW-mo/yr
- -
02 2.7131: Add area lighting switches $860 $90 $860
13,482
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,521 $1,200 $1,028
16,120
kWh
$493
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $267 $233 $203
3,224
kWh
$64
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,097 $5,250 $2,094
32,825
kWh
$1,003
-
kW-mo/yr
- -
06 2.4133: Use most efficient type of electric motors $469 $905 $374
5,862
kWh
$95
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,456 $14,990 $4,891
76,788
kWh
$1,565
-
kW-mo/yr
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,827 $24,062 $6,827
106,975
kWh
- - -
09 3.5313: Increase amount of waste recovered for resale $22,785 $100 - - $22,785
-
lb
-
10 4.111: Add equipment/ operators to reduce production bottleneck $151,580 $152,960 - - - $151,580
TOTAL RECOMMENDED $197,535 $199,790 $19,671
308,324
kWh
$3,499
-
kW-mo/yr
$22,785
-
lb
$151,580
TOTAL IMPLEMENTED $170,132 $193,240 $16,549
259,379
kWh
$2,003
-
kW-mo/yr
- $151,580
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs