ITAC Assessment: SD0148
ITAC logo
ITAC Assessment: SD0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Medical Devices for Open Heart Surgery
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $50
M
to 100
M
# of Employees 330
Plant Area 186,000
ft2
Annual Production 465,000
lb
Production Hrs. Annual 4,590
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $455,481 6,620,457
kWh
Electricity Demand $129,853 16,405
kW-mo/yr
Natural Gas $14,720 1,846
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,657 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $85,657

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,248 $2,380 $2,248
27,550
kWh
- - -
02 2.1223: Install smaller boiler (increase high fire duty cycle) $45,359 $5,823 - $45,359
-
MMBtu
- -
03 2.1231: Establish burner maintenance schedule for boilers $4,743 $450 - $4,743
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $24,027 $39,147 $24,027
285,463
kWh
- - -
05 2.7144: Install spectral reflectors / delamp $2,679 $2,670 $2,679
29,894
kWh
- - -
06 2.7135: Install occupancy sensors $5,177 $2,429 $5,177
59,789
kWh
- - -
07 3.8132: Use less toxic and volatile solvent substitutes $784 $1,450 - - - $784
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $640 - - - $640
-
lb
-
TOTAL RECOMMENDED $85,657 $54,349 $34,131
402,696
kWh
$50,102
-
MMBtu
$640
-
lb
$784
TOTAL IMPLEMENTED $85,657 $54,349 $34,131
402,696
kWh
$50,102
-
MMBtu
$640
-
lb
$784
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs