Assessment Year | 1996 |
---|---|
Principal Product | Medical Devices for Open Heart Surgery |
NAICS |
n/a
|
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $50 M to 100M |
# of Employees | 330 |
Plant Area |
186,000
ft2
|
Annual Production | 465,000
lb
|
Production Hrs. Annual | 4,590
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $455,481 | 6,620,457 |
kWh
|
$0.069 |
Electricity Demand | $129,853 | 16,405 |
kW-mo/yr
|
$7.92 |
Natural Gas | $14,720 | 1,846 |
MMBtu
|
$7.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $85,657 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $85,657 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,248 | $2,380 |
$2,248
27,550
kWh
|
- | - | - | |
02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $45,359 | $5,823 | - |
$45,359
-
MMBtu
|
- | - | |
03 | 2.1231: Establish burner maintenance schedule for boilers | $4,743 | $450 | - |
$4,743
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,027 | $39,147 |
$24,027
285,463
kWh
|
- | - | - | |
05 | 2.7144: Install spectral reflectors / delamp | $2,679 | $2,670 |
$2,679
29,894
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $5,177 | $2,429 |
$5,177
59,789
kWh
|
- | - | - | |
07 | 3.8132: Use less toxic and volatile solvent substitutes | $784 | $1,450 | - | - | - | $784 | |
08 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $640 | - | - | - |
$640
-
lb
|
- | |
TOTAL RECOMMENDED | $85,657 | $54,349 |
$34,131
402,696
kWh
|
$50,102
-
MMBtu
|
$640
-
lb
|
$784 | ||
TOTAL IMPLEMENTED | $85,657 | $54,349 |
$34,131
402,696
kWh
|
$50,102
-
MMBtu
|
$640
-
lb
|
$784 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs